Pladis

Project Title

Mezzanine Floor Repair & Sandwich Panel Installation

Client

{{brizy_dc_image_alt imageSrc=

About Project

Pipehub Nigeria Limited was engaged by Pladis to carry out essential repairs and upgrades to their facility’s mezzanine floor. The project involved the removal and replacement of damaged sections, reinforcement of structural supports, and installation of high-quality sandwich panels to restore both safety and operational efficiency.

Our team ensured precise alignment of panels, secure fixing, and compliance with industrial standards, while minimising disruption to ongoing facility operations. The repairs enhanced load-bearing capacity and provided a durable, hygienic surface suitable for production and storage activities.

Highlights

Project Gallery

Previous

Mamuda

Next

NDL